Measure how well a machine or line uses its planned production time. Enter the shift, stops, ideal cycle time and part counts to get availability, performance, quality and overall OEE, with a breakdown of where the time was lost.
Last updated:
Time
min
min
Excluded from OEE. Planned production time = shift − planned stops
min
Breakdowns, changeovers, waiting for material
Speed
The fastest the machine can run one part under ideal conditions
Count
units
units
Exclude scrap and parts that needed rework
Enter your values to see the result.
Advertisement
Advertisement
How to use the OEE Calculator
Enter the shift length and the planned stops (breaks, meals) that are excluded from OEE.
Enter unplanned downtime: breakdowns, changeovers and other stops during planned time.
Enter the ideal cycle time or ideal rate and pick its unit.
Enter the total and good counts for the same period.
Read OEE and its three factors, then use the loss breakdown to decide what to improve first.
OEE formulas
Factor
Formula
Example
Planned production time
shift length − planned stops
480 − 60 = 420 min
Run time
planned production time − downtime
420 − 47 = 373 min
Availability
run time ÷ planned production time
373 ÷ 420 = 88.81%
Performance
(ideal cycle time × total count) ÷ run time
(1 s × 19,271) ÷ 22,380 s = 86.11%
Quality
good count ÷ total count
18,848 ÷ 19,271 = 97.80%
OEE
availability × performance × quality
0.8881 × 0.8611 × 0.9780 = 74.79%
OEE benchmarks
OEE
What it usually means
100%
Perfect production: only good parts, at ideal speed, with no stops
85%+
World-class for discrete manufacturing; a long-term goal for many plants
60–85%
Typical; there is clear room for improvement
40–60%
Low, but common when a company first starts measuring OEE
Under 40%
Large losses; check downtime and the ideal cycle time first
How to improve each factor
Availability: log every stop with a reason, attack the longest and most frequent ones, and shorten changeovers with SMED (quick-changeover) methods.
Performance: count minor stops and slow cycles; jams, misfeeds and running below rated speed often hide here because no one records them as downtime.
Quality: track scrap and rework at start-up separately from steady running, and fix the root cause of the most common defect.
Measure consistently. Keep the same definitions of planned stops and ideal cycle time from shift to shift, or the trend will not mean much.
Frequently asked questions
What is OEE?
Overall Equipment Effectiveness (OEE) is the share of planned production time that is truly productive: making only good parts, as fast as possible, with no stops. 100% OEE means perfect production; it is the product of availability, performance and quality.
How do you calculate OEE?
OEE = Availability × Performance × Quality. Availability = run time ÷ planned production time. Performance = (ideal cycle time × total count) ÷ run time. Quality = good count ÷ total count. A shortcut gives the same answer: OEE = (good count × ideal cycle time) ÷ planned production time.
What is a good OEE score?
85% is widely quoted as world class for discrete manufacturing (about 90% availability, 95% performance and 99.9% quality). Around 60% is typical, and 40% is common for plants just starting to measure. Comparing a machine with its own history is often more useful than comparing with other plants.
What is the difference between planned stops and downtime?
Planned stops, such as breaks, meals or no scheduled orders, are removed before OEE is calculated, so they do not lower the score. Unplanned stops such as breakdowns, material shortages and usually changeovers count as downtime and reduce availability.
Why is my performance above 100%?
Performance cannot truly exceed 100%. If it does, the ideal cycle time is set slower than the machine can really run, or the counts or run time are wrong. Use the fastest cycle time the equipment is designed for, such as the nameplate speed.
What are the six big losses in OEE?
Availability losses are equipment failures and setups or adjustments. Performance losses are idling and minor stops, and reduced speed. Quality losses are process defects and reduced yield at start-up. The time breakdown in this calculator groups lost time into these three categories.
Does good count include reworked parts?
No. For OEE, good count means parts that passed the first time without rework. Reworked parts count in the total but not in the good count, because the time spent making them the first time was not productive.
Are all the tools on FreeToolCabin tested for quality and accuracy?
Yes! Every tool on our site undergoes automated Q/A testing in real browser environments to ensure high precision, correct output, and zero errors. If you happen to spot a bug or have a suggestion, please contact us at [email protected] and our team will review it right away.